Remodeling change order form
A change order should answer three questions before work starts: what changes, what it costs, and who agreed. RemodelKit puts all three on one page the homeowner signs on their phone, then locks it into a PDF for your job file.
What's on a RemodelKit change order
- Line items with amounts — credits too, as negative lines.
- An optional link to the selection that caused it, so an upgraded countertop traces back to the approval.
- The running budget impact: original contract, signed changes so far, and the new total after this one.
- A signature drawn with a finger or mouse plus the typed name, the time, and a SHA-256 fingerprint of exactly what was signed.
Signed means locked
Once signed, a change order can't be edited. If the scope changes again you create a revision: it copies the lines into a new change order that has to be signed again, and when it is, it replaces the original in the totals. Both stay in the record.
Sign on site or remotely
Send the change order to the homeowner's project link, or hand them your tablet and sign in person. Either way the signed PDF downloads instantly and is byte-for-byte the same every time you download it.
What it isn't
Signatures in RemodelKit are ordinary electronic signature records — not qualified signatures, and not legal advice. RemodelKit doesn't collect payments. Use the contract your attorney prepared; RemodelKit keeps the record of what was agreed.
Prefer paper for now? Print the free change order template.
Write your next change order in RemodelKit
Free for unlimited projects, homeowners and subs. No account and no email — you get a private owner link and a recovery code.