How to run finish selections
Published 2026-11-22 · By RT Technologies Inc.
Selections go wrong in predictable ways: decisions arrive late, allowances get forgotten, and nobody can show who approved the upgrade. This process keeps every choice written down without slowing the homeowner down.
1. List every decision before demo day
Walk the plans room by room and list each finish the homeowner has to choose: cabinets, hardware, counters, backsplash, sinks, faucets, lighting, flooring, paint, trim. Note which trade needs the answer and when. A late tile decision rarely stalls the tile setter alone — it stalls the plumber waiting on the valve trim.
2. Put the allowance next to every item
Copy the allowance for each item out of your contract. If an item has no allowance, write $0 so any choice with a cost is visibly an upgrade. Homeowners take overages much better when they see them at the moment of choosing rather than on an invoice.
3. Offer two or three real options
For each decision, give two or three options you have actually priced, with a photo, the price and a one-line note (“handmade, colour varies”, “needs a cabinet change”). Unlimited choice slows decisions down; a short list with a clear default speeds them up.
4. Set a decision date that protects the schedule
Work backwards from the install date and the supplier lead time. Put the date on the selection, and say plainly what happens if it slips: “If we don't have a choice by the 12th, the counters move two weeks.”
5. Get the approval in writing — every time
An approval should record which option, at what price, by whom, and when. A text thread doesn't. Whether you use a signed paper sheet or a portal, don't order anything without it.
6. Treat changes after approval as a new decision
Prices change and products get discontinued. When that happens, don't quietly swap the product: send the updated option back to the homeowner and get a fresh approval. If the change costs money, write a change order and link it to the selection.
7. Share the result with the trades
Once a finish is approved, the installer needs the final model and colour — not the whole conversation, and not your prices. Send each trade only the finishes for the rooms they work in.
How RemodelKit handles this
Each step above is built into RemodelKit selections: rooms and categories, allowances shown against every price, due dates, photo options, one-tap approval with a time-stamped record, automatic re-confirmation after edits, and sub links that show only approved finishes without prices. It's free for small remodelers.
Prefer paper for now? Start with the printable selection sheet.